L'Étape du Tour Training Plan
L’Étape du Tour puts you on a real Tour de France mountain stage, on closed roads, a few days before the pros race it. Most editions are 150 to 170 km with 3,500 to 4,500 m of climbing, and there are time cut-offs with the broom wagon behind you.
This 16 week plan from the YNR coaches gets you to the start line able to climb for an hour at a time, fuel properly all day and still have the legs for the final climb. Every session has power zones and an RPE, so it works with or without a power meter, indoors or out.
Who this Étape du Tour plan is for
This plan is for riders who already ride regularly and want to finish the Étape strong, not just survive it. You should be comfortable riding for three to four hours before you start.
- You have an Étape du Tour entry, or a place on a similar Alpine or Pyrenean sportive
- You can train 7 to 11 hours a week, with time for a longer ride at the weekend
- You have been riding consistently for at least a year
- You live somewhere flat and need a plan that still prepares you for long climbs
What the plan trains
- Long climbs at sustained power. Sweet spot and threshold blocks of 15 to 25 minutes at climbing cadence.
- Back to back weekend rides. A long hilly ride followed by a steady ride on tired legs, the way the event feels after the second climb.
- Fuelling. You practise 60 to 90 g of carbohydrate an hour on every long ride, so event day is nothing new.
- Pacing. A power and RPE plan for each climb so you do not blow up on the first col.
How the 16 weeks are structured
Every fourth week is lighter so you absorb the training. The plan builds towards a full event simulation two weeks out.
| Weeks | Phase | What you work on |
|---|---|---|
| 1 to 4 | Base | Aerobic endurance, cadence work and your first sweet spot sessions |
| 5 to 8 | Build 1 | Longer sweet spot climbs, a longer weekend ride and fuelling practice |
| 9 to 12 | Build 2 | Threshold and over-under efforts on climbs, back to back weekend rides |
| 13 to 14 | Event specific | Event pace climbing blocks and your longest ride, with your full fuelling plan |
| 15 to 16 | Taper | Less volume, short sharp efforts to stay fresh, then event week |
A sample week
Here is a typical week from Build 2, about 9 hours in total.
| Day | Session | Time |
|---|---|---|
| Monday | Rest | None |
| Tuesday | Sweet spot climbing: 3 x 15 minutes at 88 to 93% of FTP, last rep at low cadence | 75 min |
| Wednesday | Endurance ride in zone 2 | 60 min |
| Thursday | Threshold over-unders: 3 x 12 minutes alternating 2 minutes at 95% and 1 minute at 105% of FTP | 75 min |
| Friday | Rest | None |
| Saturday | Long hilly ride with the climbs at tempo, fuelling 60 to 80 g of carbohydrate an hour | 3.5 hours |
| Sunday | Steady endurance ride on tired legs | 2 hours |
Midweek sessions work well on a smart trainer. If you miss a session, skip it and carry on rather than doubling up.
What’s in every plan
Power and RPE
Every session has FTP zones and an RPE, so it works with or without a power meter.
Indoors or out
Midweek sessions suit a smart trainer and long rides can go outside.
Add strength for £15
Add our 12-Week Winter Strength Plan at checkout for £15 (usually £39).
Fuelling guidance
What to eat before, during and after key sessions, plus an event day plan.
Built in recovery
Lighter weeks are planned in, so you absorb the work and keep improving.
Coach designed
Written by YNR coaches who race at National A and Elite level.
Read the guide, then follow the plan
Our L’Étape du Tour training guide explains what the day is like, how to pace the climbs and what to eat. This plan turns that into a week by week schedule. If your event is longer, with more climbing, look at the La Marmotte training plan.
Want the plan built around you instead? 1-1 cycling coaching starts at £85 a month, and a lactate test in London sets your zones from your own physiology. You can also compare every option on the training plans page.
Frequently asked questions
Start 16 weeks before the event. If you have longer than that, ride our free winter base plan first so you start the 16 weeks with a good aerobic base.
Yes. The climbing sessions are sustained efforts at climbing cadence, so you can do them on a smart trainer or on a long, steady drag. What matters is holding the power for 15 to 25 minutes, not the gradient.
No. Every session has power zones based on your FTP and an RPE, so you can ride to feel if you do not have a power meter.
Most riders need 60 to 90 g of carbohydrate an hour. The plan has you practise this on every long ride and includes an event day fuelling plan.
Yes. It suits any Alpine or Pyrenean sportive of a similar length. For a bigger day with around 5,000 m of climbing, choose the La Marmotte plan.
We are putting the finishing touches to it now. Join the waitlist below and you will be the first to know when it is available.
Join the training plans waitlist
Tell us which plan you want and we’ll email you as soon as it launches.
